We have four 25 ton jacks for lifting engines
A very well developed programme for undertaking
heavy lifts ensures safety at all times.
Mark is one of the two trained staff leading the lift
jaks are3 made ready to lower the frames as soon
as the wheels have been rolled clear.
All staff are briefd before the lift begins
Axle boxes rolled over hydraulic platforms to be
dismantled
Frames now safely down and supported by jacks
No comments:
Post a Comment