Annually, in September, we have a week devoted to repairing our track and civil infrastructure. Occasionally we need to extend this if the repair job is too big to complete in a week! This September is one of those occasions, as we need three weeks to complete work to eradicate the landslips that threaten the area around ‘Ebor Lane Bridge’ near Haworth (the bridge made famous at the end of The Railway Children film).
With the line severed north of Haworth Station, accordingly we will be operating a revised but varied timetable:
For more details and the detailed timetable, click HERE>>>
|
The blog of a retired marine engineer who is old enough to remember the steam era and the joys of holiday trips in trains hauled by steam engines. Please feel free to comment or contact me on teachertalk1234@yahoo.co.uk. The blog is updated daily so please look back or follow regularly so as not to miss information and pictures
Total Pageviews
Friday, 13 September 2019
K&WVR Locomotive Roster for the weekend Saturday 14th & Sunday 15th September 2019
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment