Here a recent photograph shows
all that is needed to reconnect the
Embsay Bolton Abbey Railway
to the main line. The track in the top 
rt hand corner is the Embsay Bolton 
Abbey line and running down the
 left is the Network Rail line to 
the quarry.
It is used twice a day, empty train
up and full train down. How can 
they justify the cost of £2,000,000.
No you did not read that wrongly
two million pounds to make the 
reconnection.
Every one and everything says it would 
add hundreds of thousands of pounds to
a rural community, struggling. Come on 
Network Rail do summat for the community
Do the right thing. 

 
 
No comments:
Post a Comment