Here at Pickering on the North Yorks Moors
It was the LNER's equivalent to the highly successful GWR Hall Class and the LMS Stanier Black Five, two-cylinder mixed traffic 4-6-0s. However, it had the additional requirement of having to be cheap because, due to wartime and post-war economies, the LNER, never the richest railway company, had to make savings.
The prototype for the new B class (later classified B1) 4-6-0 was built at Darlington and entered service on 12 December 1942. It was the first 2 cylinder main-line locomotive constructed for the LNER since the grouping, such had been Sir Nigel Gresley's faith in the 3 cylinder layout. With cost saving a wartime priority the LNER's draughtsmen went to great lengths to re-use existing patterns, jigs and tools to economise on materials and labour. Extensive use was made of welding instead of steel castings. The boiler was derived from the Diagram 100A type fitted to the LNER Class B17 Sandringham 4-6-0s but with a larger grate area and an increase in boiler pressure to 225 pounds per square inch (1.55 MPa).
They enjoyed similar popularity on ex-Great Northern and Great Central territory. Engines based at Darnall, Sheffield were regularly rostered for the Master Cutler and South Yorkshireman expresses. Elsewhere there were substantial allocations in Scotland, West Yorkshire and on Humberside.
Many thanks Wikipedia for the notes the pictures are my own
No comments:
Post a Comment