Undoubtedly a very professional job by the chaps
at Haworth and I repeat what a pleasure it was to
meet and talk with them
I don't think it will be long before the frames and
boiler are reunited.
I am told the frames are now complete so it is within
the very foreseeable future that we shall see 85 back
in steam on the railway.
The railway states that another medium engine
would be a welcome addition to the present
very good stable of engines available to the
running dep't
Once and as always many thanks to
Do support them in whatever way you can as without them our interest would be nothing
No comments:
Post a Comment