Lancashire and Yorkshire Ironclad 957

Work on L&Y 957 has now moved to about the 
mid point


Almost completely stripped down and clearances
returned to what they should be. 


Left hand slide bars away for redressing and will
soon be refitted


Piano wires set down the bores to ensure when 
we refit the slide bars they are central


The big ends and eccentric sheaves machined 
to take up excessive clearances. 


The next big operation before rebuilding the bottom
end is to lift the frames and drop the wheel sets
out to examine the axle boxes