Total Pageviews

Wednesday, 17 December 2014

The BR or sometimes called Brighton class 4

Brighton railway works was one of the earliest railway-owned locomotive repair works, founded in 1840 by the London and Brighton Railway in Brighton, England, and thus pre-dating the more famous railway works at Crewe, Doncaster and Swindon. The works grew steadily between 1841 and 1900 but efficient operation was always hampered by the restricted site, and there were several plans to close it and move the facility elsewhere. Nevertheless between 1852 and 1957 more than 1200 steam locomotives as well as prototype diesel electric and electric locomotives were constructed there, before the eventual closure of the facility in 1962.
 
 
In the decade after the nationalisation of British Railways(BR) in 1948 Brighton works was again used for new locomotive construction, being responsible for both design work and construction of several of the new BR Standard classes and in particular the class 4 tank.

 
Brighton staff were involved in the design of three of the most successful BR standard classes – the class 4 4-6-0 tender, and class 4 2-6-4 tank classes together with the 9F 2-10-0 class – and the works built 130 examples of the class 4 tank locomotives after 1951. New locomotive construction ceased in 1957 with the construction of BR standard class 4 tank 80154, which was the 1,211th locomotive to be constructed there.

 
On the nationalisation of British Railways (BR) in 1948 the London Midland Region had a number of ex-London, Midland and Scottish Railway 2-6-4T and the Western Region a number of GWR Large Prairie 2-6-2T types. These tank engines were particularly suited to commuter and secondary services. However, particularly in Scotland and the Southern Region, the situation was not so good with large numbers of pre-grouping types struggling on.

 
Based on the ex-LMS Fairburn 2-6-4T. Design work was done at Brighton, the overall programme being overseen by R.A. Riddles. The principal modifications to the Fairburn design involved the reduction of their envelope to enable them to fit into the L1 loading gauge. To do this the tanks and cab were made more curved than the Fairburn design, the Fairburn having a straight-sided tank. The biggest mechanical change was a reduction in cylinder size, also to reduce cross-section, and a corresponding increase in boiler pressure to compensate. Other visible changes include the reintroduction of plating ahead of the cylinders.

 
130 of the class of 155 were built at Brighton, 15 (80000–80009, 80054–80058) at Derby Works and 10 (80106–80115) at Doncaster Works between 1951 and 1956. The first to emerge was 80010 from Brighton in 1951. Fifteen that were due to be constructed in 1957 were cancelled due to impending dieselisation, and the last five would have been too had they not been at an advanced stage of construction when the order came to cancel them.
No significant modifications were made to the design. The tank vent was found to restrict the driver's vision and was moved further forward from 80059. Initially built with fluted coupling rods, these caused problems on other classes and from 80079 plain section coupling rods were substituted.

 
The Standard 4 tanks were originally allocated to all regions of British Railways, except the Western. They became particularly associated with the London, Tilbury and Southend Line (LT&S) working commuter services out of London until that route was electrified in 1962. They were also widely used in East Sussex and Kent working from Brighton, Tunbridge Wells and Three Bridges on those lines of the former London Brighton and South Coast Railway that were not electrified. Another group worked from Polmadie depot in the Scottish region on the Glasgow commuter services. Note that from July 1962, a batch displaced by electrification of the LT&S was transferred to the Western Region's Swansea (East Dock) and Shrewsbury districts, as well as other regions.
 
Many thanks to Wikipedia for the notes
 
Photographs including the one of the 3.5 inch gauge one were taken at the Princess Royal Locomotive Trust at Swanwick Junction West Shed where 80098 was undergoing heavy overhaul.
Many thanks to them for a great visit.

No comments:

Post a Comment